top of page


Material Selection for Tropical Durability
Material selection in the tropics is the most consequential design decision after orientation. UV breaks down polymers, humidity cycles through every porous surface, and monsoon rain finds every joint. This piece breaks down what survives fifteen years of Phnom Penh weather, what fails by year seven, and the specification discipline serious builders run before construction documents are issued.

Sreyna Vale
May 214 min read


Amenity Floor Distribution and the Capacity Question
Most condominium towers in this market place every amenity on a single floor. It reads well on a brochure and underperforms on a Saturday afternoon. A look at the capacity math, the vertical travel penalty, and what a dispersed amenity program does differently when the brief is written properly.

Sreyna Vale
May 194 min read


How an Architectural Brief Is Actually Developed
An architectural brief, developed properly, takes four to eight weeks and produces a fifteen to thirty page document. Most projects spend ten days on it. The cost of that compression does not show up at handover. It shows up in year five, when no one remembers who decided what. The brief is the highest-leverage stage in the entire process, and almost always the most rushed.

Sreyna Vale
May 114 min read
bottom of page
