top of page
Systems and Performance Metrics


Ceiling Heights and the Math of 300 Millimeters
Ceiling height is treated as a finish-level choice. It is not. It is a structural decision made at the brief stage, locked before the first elevation is drawn, and almost impossible to revisit. The compounding effects on daylight, airflow, thermal performance, and resale value run the full life of the building. Three hundred millimeters at the top of the room is more consequential than the dimension suggests.

Sreyna Vale
3 days ago4 min read
Â
Â
Â


Balcony Depth and the Usable Outdoor Square Meter
A balcony at 1.0 meter fits one chair. At 1.5 meters, a small table appears. At 2.0 meters, the balcony becomes a room. Most pricing models count balcony square meters at half the indoor rate, but usability is a function of depth, not footprint. In a tropical climate, depth also decides whether the space survives a passing storm. The single number worth carrying into a unit viewing is balcony depth.

Sreyna Vale
6 days ago5 min read
Â
Â
Â


Amenity Floor Distribution and the Capacity Question
Most condominium towers in this market place every amenity on a single floor. It reads well on a brochure and underperforms on a Saturday afternoon. A look at the capacity math, the vertical travel penalty, and what a dispersed amenity program does differently when the brief is written properly.

Sreyna Vale
May 194 min read
Â
Â
Â


The Party Wall STC That Decides Resident Retention
Most condominium party walls in tropical residential construction never reach the STC 50 code minimum. The number sits in the framing details and shows up later, when residents hear their neighbor's life through the wall. STC is not a comfort metric. It is the construction decision that determines retention, resale velocity, and whether a unit remains the private space it was offered as.

Sreyna Vale
May 125 min read
Â
Â
Â


The Parking Ratio Question in Mid-Rise Residential
A parking stall costs $12,000 to $25,000 to build underground in Phnom Penh, and most ratios in this market are set by reflex. Underbuild and the spillover lands on the street. Overbuild and the capital sits in concrete for forty years. A working framework by unit type, transit context, and the conversion and EV-readiness questions most briefs do not ask.

Sreyna Vale
May 44 min read
Â
Â
Â
bottom of page
